Quick Tender Policy Implementation on Procurement of Goods and Services in the Government of East Java Province

N A D Hidawan, - and Falih Suaedi, - and R Rahardian, - (2020) Quick Tender Policy Implementation on Procurement of Goods and Services in the Government of East Java Province. In: B-SPACE 2019: Proceedings of the First Brawijaya International Conference on Social and Political Sciences. European Alliance for Innovation, pp. 1-15.

[img] Text (ARTIKEL)
29. Quick Tender Policy.pdf

Download (1MB)
[img] Text (SIMILARITY)
29. Turnitin Quick Tender Policy.pdf

Download (1MB)
[img] Text (VALIDASI)
29. Validasi Quick Tender Policy Implementation on Procurement of Goods and Services in the Government of East Java Province.pdf

Download (426kB)

Abstract

Quick Tender is an innovation carried out by the state by cutting the evaluation of elections and leaving evaluation of prices. It is expected that the procurement of goods needed by the government is available and can be done quickly. The Quick Tender has been carried out by the Goods and Services Procurement Department but is not fully successful. It was noted that in 2019 there was a provider determined as the election working group or better known as the tender committee but resigned because they felt unable to fulfill the package. This study aims to look at the implementation of a rapid tender conducted by the Working Group and identify why the problem of the provider who has been designated as a tender resigned. Research using qualitative methods. Data collection techniques using interviews and documentation. this research lasted for three months. The theory used in analyzing this policy uses four variables of the George C. Edward III implementation model with the result that in the process of selecting a fast tender for other goods / construction / service providers by utilizing the Performance Information System for Goods / Services Providers (SIKaP) which do not require qualification assessment, administrative, and technical stages according to the provisions of LKPP Regulation No. 19 of 2018 but the credibility of the data from SIKaP has not been confirmed and cannot describe the mastery of the ability of providers to carry out the work won. This research concludes that there is a need to improve the SIKaP and the application of a fast tender (SPSE) to support the implementation of a fast tender that only evaluates prices

Item Type: Book Section
Uncontrolled Keywords: policy implementation, quick tender, LPSE, SPSE
Subjects: H Social Sciences > H Social Sciences (General)
Divisions: 07. Fakultas Ilmu Sosial dan Ilmu Politik > Administrasi Negara
Creators:
CreatorsNIM
N A D Hidawan, --
Falih Suaedi, -NIDN0026026306
R Rahardian, --
Depositing User: Tn Slamet Triyono
Date Deposited: 05 May 2023 08:40
Last Modified: 08 May 2023 02:13
URI: http://repository.unair.ac.id/id/eprint/126209
Sosial Share:

Actions (login required)

View Item View Item