Cholichul Hadi, Dr. M.Si (2008) OPTIMALISASI KINERJA EKONOMI KELOMPOK MELALUI BENTUK KERJASAMA TIM. UNIVERSITAS AIRLANGGA, SURABAYA. (Unpublished)
|
Text (ABSTRAK)
gdlhub-gdl-res-2008-hadicholic-6272-lp01_08-k.pdf Download (511kB) | Preview |
|
Text (FULLTEXT)
gdlhub-gdl-res-2008-hadicholic-6272-lp01_08.pdf Restricted to Registered users only Download (2MB) | Request a copy |
Abstract
The farmer economic group performance in East Java was still apprehensive or concerned. So an experiment to improve the economic group performance were designed. There were many problems that influence the farmers economic performance. One of its problem is interdependencys task problem. The problem was teamwork. The form of teamwork in the interdependencys group were pool, sequential, reciprocal and team. Team : team members jointly diagnose, problem solve, and collaborate to complete a task. The task required mutual interactions with team discretion to decide on particular course. Sequential: one teal member must act before another could act, but interaction was essential for effective performance. Reciprocal team members had different roles and were often specialists with different expertise. They performed different parts of task in a flexible order. The problem that would examined was futher could be formulated was: why the group economic performance that were seen from twenty economic activities aspects were weak? How were the comparison between group performance? The main advantage of this research was improving work value system. This research was expected to give the group teamworks farmers group in the village based on gotong-royong (community self-help; mutual cooperation; share work) Based on theoretical review, and previous findings it could be hypothesized that the task interdependency could improve group performance. The sampling technique that was used in this research was multistage random sampling. The questionnaires were administrated. The questionnaires were distributed through the first harvest during the season. All of the items after try out were valid. The real experiment were conducted in the second harvest and third. The subjects of the experiments were 180 in Sidoarjo. The team performance was the best, followed by the performance of reciprocal task interdependence, sequential task interdependence performance, and the lowest of performance was pool task interdependency.
Item Type: | Other | ||||
---|---|---|---|---|---|
Additional Information: | KKB KK-2 LP 01/08 Had o | ||||
Uncontrolled Keywords: | Interdependence, performance, group team | ||||
Subjects: | H Social Sciences > HB Economic Theory | ||||
Divisions: | Unair Research > Non-Exacta | ||||
Creators: |
|
||||
Depositing User: | Nn Deby Felnia | ||||
Date Deposited: | 21 Oct 2016 21:57 | ||||
Last Modified: | 21 Oct 2016 21:57 | ||||
URI: | http://repository.unair.ac.id/id/eprint/40530 | ||||
Sosial Share: | |||||
Actions (login required)
View Item |