PENERAPAN MRP II DALAM MENDUKUNG PROSES PERENCANAAN PRODUKSI DAN KEBUTUHAN SUMBER DAYA PADA PT. NESTLE INDONESIA PABRIK WARU

HARIS SUSILO, 049711873 E (2002) PENERAPAN MRP II DALAM MENDUKUNG PROSES PERENCANAAN PRODUKSI DAN KEBUTUHAN SUMBER DAYA PADA PT. NESTLE INDONESIA PABRIK WARU. Skripsi thesis, Universitas Airlangga.

[img]
Preview
Text (ABSTRAK)
KK A 123.02 Sus p.pdf

Download (581kB) | Preview
Official URL: http://lib.unair.ac.id

Abstract

ABSTRAK INI MEMBAHAS TENTANG :PENERAPAN MRP II DALAM MENDUKUNG PROSES PERENCANAAN PRODUKSI DAN KEBUTUHAN SUMBER DAYA PADA PT. NESTLE INDONESIA PABRIK WARU

Item Type: Thesis (Skripsi)
Additional Information: KK A.123-02 Sus p.
Subjects: H Social Sciences > HF Commerce > HF5601 Accounting
Divisions: 04. Fakultas Ekonomi dan Bisnis > Akuntansi
Creators:
CreatorsNIM
HARIS SUSILO, 049711873 EUNSPECIFIED
Contributors:
ContributionNameNIDN / NIDK
Thesis advisorBASUKI, DRS.,M.COM.,PH.DUNSPECIFIED
Depositing User: Mr Bambang Husodo
Date Deposited: 04 Jan 2017 18:10
Last Modified: 04 Jan 2017 18:10
URI: http://repository.unair.ac.id/id/eprint/50432
Sosial Share:

Actions (login required)

View Item View Item