ANALISA PERBANDINGAN ALTERNATIF PENYELESAIAN ANTARA WAKTU NORMAL DAN PERCEPATAN PADA PEMBANGUNAN PROYEK KAPAL PAX-500 DI PT. PAL INDONESIA (PERSERO) SURABAYA

Rr. RENY PUSPITA VIRGIANTI, 049721747 E (2001) ANALISA PERBANDINGAN ALTERNATIF PENYELESAIAN ANTARA WAKTU NORMAL DAN PERCEPATAN PADA PEMBANGUNAN PROYEK KAPAL PAX-500 DI PT. PAL INDONESIA (PERSERO) SURABAYA. Skripsi thesis, Universitas Airlangga.

[img]
Preview
Text (ABSTRAK)
KK B 162.01 Vir a.pdf

Download (575kB) | Preview
Official URL: http://lib.unair.ac.id

Abstract

ABSTRAK INI MEMBAHAS TENTANG :ANALISA PERBANDINGAN ALTERNATIF PENYELESAIAN ANTARA WAKTU NORMAL DAN PERCEPATAN PADA PEMBANGUNAN PROYEK KAPAL PAX-500 DI PT. PAL INDONESIA (PERSERO) SURABAYA

Item Type: Thesis (Skripsi)
Additional Information: KK B.162-01 Vir a.
Subjects: G Geography. Anthropology. Recreation > GE Environmental Sciences > GE300-350 Environmental management
Divisions: 04. Fakultas Ekonomi dan Bisnis > Manajemen
Creators:
CreatorsNIM
Rr. RENY PUSPITA VIRGIANTI, 049721747 EUNSPECIFIED
Contributors:
ContributionNameNIDN / NIDK
Thesis advisorHERMAWANTO, DRS. MSC.,MBAUNSPECIFIED
Depositing User: Mr Bambang Husodo
Date Deposited: 15 Jan 2017 19:20
Last Modified: 15 Jan 2017 19:20
URI: http://repository.unair.ac.id/id/eprint/51050