Browse by
Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Name | Item Type | No Grouping
Jump to: T
Number of items: 4.

T

YUSI MAYA SARI, 049520714 E. (1998) ANALISA PERENCANAAN TENAGA KERJA TERHADAP USAHA PENCAPAIAN TARGET PRODUKSI YANG OPTIMAL PADA DIVISI PRODUKSI SCHAKELAR PT. TEKHNIKA KENCANA-SIDOARJO. Skripsi thesis, Universitas Airlangga.

INDRA WIRAWAN, 049314350 (1999) ANALISIS PENGARUH FAKTOR-FAKTOR PELATIHAN TERHADAP PRESTASI KERJA KARYAWAN BAGIAN SERVIS DI PUB 'X'. Skripsi thesis, Universitas Airlangga.

MUTIARA HARGINI, 049615247 (2003) ANALISIS PENGARUH FAKTOR-FAKTOR PERENCANAAN KEBUTUHAN TENAGA KERJA TERBADAP JUMLAH TENAGA KERJA BAGIAN PRODUKSI CV. LOH JINAWI SURABAYA. Skripsi thesis, Universitas Airlangga.

ERNIE ZAHIROH, 049133868 (1998) PENGARUH DISIPLIN KERJA KARYAWAN DALAM MENINGKATKAN HASIL PRODUKSI PT. KABOLI LUMBER BANJARMASIN. Skripsi thesis, Universitas Airlangga.

This list was generated on Wed Dec 4 16:44:51 2024 WIB.