Items where Subject is "T Technology > TA Engineering (General). Civil engineering (General) > TA190-194 Management of engineering works"
Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type
Jump to: A | H | M | P | R | S
Number of items at this level: 6.

A

Ady Soejoto (2003) ANALISIS BEBERAPA FAKTOR YANG MEMPENGARUHI KEPUTUSAN KONSUMEN PENGGUNA KAPAL PENYEBERANGAN LINTAS UJUNG KAMAL JAWA TIMUR. Thesis thesis, UNIVERSITAS AIRLANGGA.

H

HERU WAHYU LAKSONO, 049620900/E (2001) ANALISIS PENGARUH FAKTOR-FAKTOR KEPUASAN KERJA TERHADAP PRESTASI KERJA KARYAWAN BAGIAN PRODUKSI PADA CV. KARYA MEKAR JOMBANG. Skripsi thesis, Universitas Airlangga.

M

MEITY MEISELANI, 049812201E (2004) ANALISIS PENGARUH PENGALAMAN MENGAKSES SEBUAH SITUS TERHADAP SITE BRAND LOYALTY (KASUS PADA PLASA.COM). Skripsi thesis, Universitas Airlangga.

P

PERDANA MAHARTIKA, 040113902 (2004) PENGGUNAAN TARGET COSTING DENGAN VALUE ENGINEERING SEBAGAI UPAYA MENINGKATKAN DAYA SAING PADA PT. X. Skripsi thesis, Universitas Airlangga.

R

RINI WISMIARNINGSIH, 040317874 (2008) PENGARUH KEPUASAN KOMPENSASI TERHADAP KINERJA GURU SMA MUHAMMADIYAH 2 SURABAYA. Skripsi thesis, UNIVERSITAS AIRLANGGA.

S

SRI WAHYUNI, 041211223028 (2018) ANALISIS DAMPAK KERUSAKAN KAPAL TUNDA MENGGUNAKAN METODE ANALYTIC HIERARCHY PROCESS (AHP) DAN USULAN PERBAIKAN DENGAN METODE THEORY OF INVENTIVE PROBLEM SOLVING (TRIZ) DI PT PELINDO MARINE SERVICE. Skripsi thesis, Universitas Airlangga.

This list was generated on Sun Dec 22 18:13:43 2024 WIB.