Items where Subject is "T Technology > TF Railroad engineering and operation > TF501-668 Railway operation and management"
Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type
Jump to: A | E | N | S
Number of items at this level: 5.

A

AGHNIA RAHMANIAR PUTRI, 041211231020 (2016) ANALISIS WAKTU PENUMPUKKAN PADA LAPANGAN PETIKEMAS TERMINAL MIRAH DI PT. PELABUHAN INDONESIA III CABANG TANJUNG PERAK SURABAYA MENGGUNAKAN TEORI ANTRIAN. Skripsi thesis, Universitas Airlangga.

ANISSA NURUL JANNAH, 151611713007 (2019) GAMBARAN FAKTOR YANG BERHUBUNGAN DENGAN KEPATUHAN PENGGUNAAN ALAT PELINDUNG DIRI (APD) (Studi pada area Shearing unit 2 PT INDOSPRING, Tbk Plant 2). Tugas Akhir D3 thesis, UNIVERSITAS AIRLANGGA.

E

Evvy Dhia Puspitasari, 100511811 (2009) PENERAPAN STANDART OPERATING PROCEDURES PADA PEKERJA KERETA API DI DIPOLOKOMOTIF STASIUN PASAR TURI DAERAH OPERASI VIII SURABAYA. Skripsi thesis, UNIVERSITAS AIRLANGGA.

N

NOVIANA NISMA SARI, 040710150 (2012) ANALISIS PRIORITAS PERBAIKAN KUALITAS LAYANAN PADA KERETA API EKSEKUTIF ARGO WILIS DENGAN PENDEKATAN METODE SERVICE QUALITY DAN ANALYTIC HIERARCHY PROCESS. Skripsi thesis, UNIVERSITAS AIRLANGGA.

S

SISKA SULISTIYO RINI (2007) PENERAPAN COST-VOLUME PROFIT ANALYSIS SEBAGAI ALAT PERENCANAAN LABA DAN PENGAMBILAN KEPUTUSAN MANAJEMEN JANGKA PENDEK PADA PT KERETA API ( Pesero) DAERAH OPERASI VII MADIUN. Skripsi thesis, UNIVERSITAS AIRLANGGA.

This list was generated on Fri Nov 22 13:22:29 2024 WIB.