PEMETAAN PROGRAM PENGEMBANGAN KOMPETENSI TEKNIS KARYAWAN PT. SURYA PRATISTA HUTAMA DENGAN MENGGUNAKAN MODEL 70:20:10

WIDHI NOVA PRASETYA (2015) PEMETAAN PROGRAM PENGEMBANGAN KOMPETENSI TEKNIS KARYAWAN PT. SURYA PRATISTA HUTAMA DENGAN MENGGUNAKAN MODEL 70:20:10. Thesis thesis, UNIVERSITAS AIRLANGGA.

[img] Text
1. HALAMAN JUDUL .pdf

Download (335kB)
[img] Text
2. ABSTRAK .pdf

Download (158kB)
[img] Text
3. DAFTAR ISI .pdf

Download (360kB)
[img] Text
4. BAB 1.pdf

Download (347kB)
[img] Text
5. BAB 2.pdf
Restricted to Registered users only until 27 May 2023.

Download (535kB) | Request a copy
[img] Text
6. BAB 3.pdf
Restricted to Registered users only until 27 May 2023.

Download (327kB) | Request a copy
[img] Text
7. BAB 4.pdf
Restricted to Registered users only until 27 May 2023.

Download (807kB) | Request a copy
[img] Text
8. BAB 5.pdf
Restricted to Registered users only until 27 May 2023.

Download (1MB) | Request a copy
[img] Text
9. BAB 6.pdf
Restricted to Registered users only until 27 May 2023.

Download (2MB) | Request a copy
[img] Text
10. BAB 7.pdf
Restricted to Registered users only until 27 May 2023.

Download (259kB) | Request a copy
[img] Text
11. DAFTAR PUSTAKA.pdf

Download (327kB)
[img] Text
12. LAMPIRAN.pdf
Restricted to Registered users only until 27 May 2023.

Download (2MB) | Request a copy
Official URL: http://lib.unair.ac.id

Abstract

The objective of this research was to: (1) compose development priority scale on employees’ technical competency grade 4-7, Manufacturing Division and (2) map development program on employees’ technical competency by using 70:20:10 Model. This research used mixed method, which is, qualitative and quantitative research method and explanatory narrative approach. The researcher collected and analyzed quantitative data, then collected and analyzed qualitative data. The population of the research was all employees of PT. Suprama, Grade 4-7, Manufacturing Division. The informants were chosen purposively. The data were analyzed from the result of technical competency gap index on employees grade 4-7, Manufacturing Division and the result of competency development priority. The research showed that (1) the composing of technical competency development priority scale on employees grade 4-7, Manufacturing Division consisted of 58 positions, 5 positions had intermediate development priority, 46 positions had upper intermediate development priority, and 7 positions had advance development priority and (2) the mapping of the technical competency development program in Manufacturing Division employees grade 4-7 consisted of 173 employees. 59 employees were going to be developed by using 70:20:10 Model. 7 employees were going to be developed by 70 Model, 27 employees were going to be developed by using 20 Model, and 25 employees were going to be developed by using 10 Model. There were 55 out of 77 technical competencies needed developing.

Item Type: Thesis (Thesis)
Additional Information: KKB KK-2 TPS.03/16 Pra p
Uncontrolled Keywords: mapping, technical competency development, 70:20:10 Model
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD30.28 Strategic planning
Divisions: 07. Fakultas Ilmu Sosial dan Ilmu Politik
Creators:
CreatorsNIM
WIDHI NOVA PRASETYANIM091314253011
Contributors:
ContributionNameNIDN / NIDK
Thesis advisorFalih SuaediNIDN0026026306
Thesis advisorBadri Munir SukocoNIDN0021035212
Depositing User: Guruh Haris Raputra, S.Sos., M.M. '-
Date Deposited: 06 Apr 2016 06:29
Last Modified: 05 Jun 2020 03:31
URI: http://repository.unair.ac.id/id/eprint/23705
Sosial Share:

Actions (login required)

View Item View Item