PERENCANAAN KEBUTUHAN PERSEDIAAN BAHAN HABIS PAKAI DENGAN METODE MMSL UNTUK MEMINIMALISASI KEJADIAN STAGNANT DAN STOCK OUT (Studi di Unit Pelayanan Fungsional Konservasi Gigi Rumah Sakit Gigi dan Mulut Pendidikan Fakultas Kedokteran Gigi Universitas Airla

DINDA DEWI ZALINDA SUMARTONO PUTRI IMAN, 101111449 (2014) PERENCANAAN KEBUTUHAN PERSEDIAAN BAHAN HABIS PAKAI DENGAN METODE MMSL UNTUK MEMINIMALISASI KEJADIAN STAGNANT DAN STOCK OUT (Studi di Unit Pelayanan Fungsional Konservasi Gigi Rumah Sakit Gigi dan Mulut Pendidikan Fakultas Kedokteran Gigi Universitas Airla. Skripsi thesis, UNIVERSITAS AIRLANGGA.

[img]
Preview
Text (ABSTRAK)
ABSTRAK.pdf

Download (93kB) | Preview
[img] Text (FULLTEXT)
FULLTEXT.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
Official URL: http://lib.unair.ac.id

Abstract

Logistics management is an important element of managerial functions in the hospital. Imprecision in planning can negatively impact hospital both medically and economically. Average stock out and stagnant in consumables materials (BHP) at UPF Conservation RSGM FKG Airlangga University of 48.25% for stagnant and 34, 25% for stock out. This study aimed to calculate inventory requirements BHP with the method of Maximum-Minimum Stock Level in order to minimize the incidence of stagnant and stock out at UPF Conservation RSGM FKG Airlangga University. This research was descriptive cross-sectional with quantitative approach. Calculation of inventory needs through ABC analysis to determine BHP as A category which will then be calculated using the Minimum-Maximum Stock Level. The results of the study by using the method of calculation using the Minimum-Maximum Stock Level at UPF Conservation RSGM FKG Airlangga University was carried out on 16 types of BHP which was A category of the 70 types of whole BHP. In addition, a known cause of stagnant and stock out were logistics management of BHP at UPF Conservation RSGM FKG Airlangga University was not running optimally start from planning to evaluation. The conclusion of this study was the implementation of logistics management at UPF Conservation RSGM FKG Airlangga University needs to be optimized. BHP inventory requirements planning can be done using the ABC analysis and Minimum-Maximum Stock Level to control the inventory to minimize the occurrence of stagnant and stock out at UPF Conservation RSGM FKG Airlangga University.

Item Type: Thesis (Skripsi)
Additional Information: KKC KK FKM. 262/14 Ima p
Uncontrolled Keywords: LOGISTICS-MANAGEMENT
Subjects: T Technology > TS Manufactures > TS156 Quality control and management
Divisions: 10. Fakultas Kesehatan Masyarakat
Creators:
CreatorsNIM
DINDA DEWI ZALINDA SUMARTONO PUTRI IMAN, 101111449UNSPECIFIED
Contributors:
ContributionNameNIDN / NIDK
Thesis advisorThinni Nurul R, Dr. .,Dra.Ec.,M.Kes.UNSPECIFIED
Depositing User: S.Sos. Sukma Kartikasari
Date Deposited: 06 Jan 2015 12:00
Last Modified: 11 Aug 2016 07:33
URI: http://repository.unair.ac.id/id/eprint/22717
Sosial Share:

Actions (login required)

View Item View Item