MODEL PENGENDALIAN BOILER TIPE CHENG CHEN DAN FIVES CAIL BABCOCK BERDASARKAN ANALISIS HAZARD DAN RISIKO DI PABRIK GULA CANDI BARU, SIDOARJO

ACHMAD ZUHDI SETIAWAN, 101042001 (2012) MODEL PENGENDALIAN BOILER TIPE CHENG CHEN DAN FIVES CAIL BABCOCK BERDASARKAN ANALISIS HAZARD DAN RISIKO DI PABRIK GULA CANDI BARU, SIDOARJO. Thesis thesis, UNIVERSITAS AIRLANGGA.

[img]
Preview
Text (ABSTRAK)
gdlhub-gdl-s2-2013-setiawanac-22363-7.abstr-t.pdf

Download (161kB) | Preview
[img] Text (FULL TEXT)
gdlhub-gdl-s2-2013-setiawanac-22363-16 full text.pdf
Restricted to Registered users only

Download (2MB) | Request a copy
Official URL: http://lib.unair.ac.id

Abstract

In 2009 occurred 16 times the case of damage to the boiler components of PG Candi Baru conversion clock stopped milled 122.77 hours. The year 2010 was 11 times the case of damage to components conversion clock stopped milled 47.35 hours . In 2011 occurred 19 times damage cases stopped milled components 72.40 hours. If the production process stops one day, then the target will not be achieved with a loss per day is estimated Rp. 1 billion - Rp. 2.1 billion (per hour when his production loss of Rp. 87.5 million). Risk analysis of hazard in the boiler, risk assessment and control measures by using a method of FTA (fault tree analysis), FMEA (failure modes and effects analysis) / RCM (reliability centered maintenance) II. Risk assessment on the boiler components obtained likelihood values multiplied by consequence. Based on the analysis of the calculation of the likelihood (Table 5.20) is the highest in boiler components, namely the installation of pipe above 8 times per year (1577 times per year). Unlike bagasse carrier (BC) who had the lowest likelihood that 2 per year. The conclusion is, the probability of plumbing installations compared to ten other boiler components (Economizer, SAF, Pump, Handhole, Bagasse Carrier, superheater, Chimney (KTM), Dumping Grade, In Draft Fan (IDF), Electrical) is much higher. The results of the calculation of the benefit cost analysis from breakdown (failure) on boiler components obtained B / C> 1, then 54.84> 1. Collaboration of methods hazard analysis FTA, FMEA/RCM II (qualitative) and hazard risk matrix can provide findings on the complexity of boiler components is effectively. Clock stops milled can lead to energy use in PG is not optimal. Pattern hour unscheduled stop that can be used for scheduled maintenance program, the clock stops milling in PG can be suppressed less than 5% (Saeku, 2009).

Item Type: Thesis (Thesis)
Additional Information: KKC KK TKK 01/12 Set m
Uncontrolled Keywords: boiler type Cheng-chen, boiler type Fives Cail Babcock, failure, risk of Hazards, FTA, FMEA, RCM II, benefit cost analysis, production loss
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD58 Industrialization
H Social Sciences > HV Social pathology. Social and public welfare > HV1-9960 Social pathology. Social and public welfare. Criminology > HV675-677 Accidents. Prevention of accidents
T Technology > TD Environmental technology. Sanitary engineering > TD1020-1066 Hazardous substances and their disposal
Divisions: 10. Fakultas Kesehatan Masyarakat > Magister Kesehatan dan Keselamatan Kerja
Creators:
CreatorsNIM
ACHMAD ZUHDI SETIAWAN, 101042001UNSPECIFIED
Contributors:
ContributionNameNIDN / NIDK
Thesis advisorTjipto Suwandi, Prof., Dr., dr., MOH., Sp.OKUNSPECIFIED
Thesis advisorY Denny Ardyanto W, Dr., Ir., MSUNSPECIFIED
Depositing User: Nn Dhani Karolyn Putri
Date Deposited: 2016
Last Modified: 21 Oct 2016 20:43
URI: http://repository.unair.ac.id/id/eprint/36626
Sosial Share:

Actions (login required)

View Item View Item